翻訳と辞書
Words near each other
・ Ghazi Phakir
・ Ghazi Saiyyad Salar Masud
・ Ghazi Salah al-Din al-Atabani
・ Ghazi Salah-ud-Din
・ Ghazi Salahuddin
・ Ghazi Shaheed
・ Ghazi Stadium
・ Ghazi Tehsil
・ Ghazi ud-Din Khan Feroze Jung
・ Ghazi ud-Din Khan Feroze Jung I
・ Ghazi ud-Din Khan Feroze Jung II
・ Ghazi ud-Din Khan Feroze Jung III
・ Ghazi University
・ Ghazi Zaiter
・ Ghazi, Khyber Pakhtunkhwa
Ghazi-Barotha Hydropower Project
・ Ghazi-ud-Din Haidar Shah
・ Ghaziabad
・ Ghaziabad (Assembly constituency)
・ Ghaziabad (Lok Sabha constituency)
・ Ghaziabad Airport
・ Ghaziabad District
・ Ghaziabad district, India
・ Ghaziabad District, Kunar
・ Ghaziabad railway station
・ Ghaziabad, Karachi
・ Ghaziabad, Kunar
・ Ghaziabad, Pakistan
・ Ghaziabad, Uttar Pradesh
・ Ghazial


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ghazi-Barotha Hydropower Project : ウィキペディア英語版
Ghazi-Barotha Hydropower Project

Ghazi-Barotha Hydropower Project ((ウルドゥー語:غازى بروتھا)) is a 1,450 MW run-of-the-river hydropower connected to the Indus River about west of Attock in Punjab, Pakistan. Construction on the project began in 1995 and the first two 290 MW generators were commissioned on 19 February 2003, the same day it was inaugurated by President Pervez Musharraf. The last generator was commissioned in April 2004 and the project was completed by that December. It cost US$2.1 billion with funding from Pakistan's Water and Power Development Authority (WAPDA), the World Bank, Asian Development Bank, Japan Bank for International Cooperation, Kreditanstalt für Wiederaufbau, European Investment Bank and Islamic Development Bank.〔(【引用サイトリンク】url=http://www.wapda.gov.pk/htmls/ghazibarotha.html )〕〔(【引用サイトリンク】url=http://www.wapda.gov.pk/htmls/ghazibarotha.html )
About 1,600 cubic meter per second of water is diverted from the Indus River near the town of Ghazi about 7 km downstream of Tarbela Dam (3,478 MW). It then runs through a 100 metre wide and 9 metre deep open power channel down to the village of Barotha where the power complex is located. In the reach from Ghazi to Barotha, the Indus River inclines by 76 meters over a distance of 63 km. After passing through the powerhouse, the water is returned to the Indus. In addition to these main works, transmission lines stretch 340 km.
The World Bank classed it "A" for adequate attention to environmental and social issues. The feasibility report was prepared in 1993 during the first tenure of Benazir Bhutto's administration and the Government of Pakistan entered into an agreement for the financing and construction of the project on 7 March 1996.〔(【引用サイトリンク】 title=WAPDA )
== See also ==

* List of hydroelectric power stations
* List of power stations in Pakistan

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Ghazi-Barotha Hydropower Project」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.